logo
  • Home
  • Aquatic Pets
  • Cats
  • Dogs
  • Pet Birds
  • Pet Reptiles
  • Small Pets
  • All Pets
  • Home
  • Dogs
Last updated: 17 Aug 2022
Pets, Paws and Claws is supported by readers. If you click a link we may earn an affiliate commission. Click here for more information.

The Best Long Leads for Dogs

Best Overall
logo
PETTOM-Training-Reflective-Tracking-Outdoor
Shop now
Most Comfortable
logo
Lampop-Training-Running-Tracking-Backyard
Shop now
Most Practical
logo
Kaka-mall-Traction-Training-Neoprene
Shop now
Most Superior
logo
Looxmeer-Recall-Lead-Dogs-20m
Shop now
logo
Retractable-Extendable-Reflective-Tangle-Free
Shop now
author-image
By Editor
Published 17 Aug 2022
Show contents
  • 1 PETTOM-Training-Reflective-Tracking-Outdoor
  • 2 Lampop-Training-Running-Tracking-Backyard
  • 3 Kaka-mall-Traction-Training-Neoprene
  • 4 Looxmeer-Recall-Lead-Dogs-20m
  • 5 Retractable-Extendable-Reflective-Tangle-Free

Every responsible pet owner should have a reliable leash. Leashes are essential tools that help keep pets and people safe while experiencing the great outdoors. It is almost always a good idea to have a long leash at hand; it will help give your dog a little more room to roam and let you maintain control. We have gathered the best long leads for dogs below.

1

PETTOM-Training-Reflective-Tracking-Outdoor

– Best Overall
img
Check On Amazon
Key Features

This versatile mountain climbing rope leash has two metal clips, and you can tie it to a pole or tree. It has a 360-degree rotation and will not tangle or get caught in the underbrush.

THE SCOOP

This nylon leash is fifty feet long, and it provides control while your dog is enjoying running freely outdoors and is great for recall training, hunting, and off-lead stimulation. It is lightweight, allowing it to float on water, and durable for camping. It is easy to track your dog at night, given its eye-catching reflective colour and material that is visible in low light.

Pros
  • Good trainer
  • High visibility
  • Floats on water
  • Strong
Cons
  • The handle is not sturdy.
2

Lampop-Training-Running-Tracking-Backyard

– Most Comfortable
img
Check On Amazon
Key Features

 This dog leash has a heavy-duty metal clip to link your dog to its collar or harness. It also has a D-ring where you can hang your storage bags, which is convenient for travelling, jogging, and walking.

THE SCOOP

 This 50-feet dog leash properties nylon and metal construction with a soft padded handle, and it is durable, sturdy, and easy to wear. It is suitable for training or other outdoor activities, and its 360-degree rotating buckle design prevents the leash from twisting and makes playing safer for your pet. The hand strap has thick neoprene padding, which is for comfortable handling and will not cut the palm of your hand.

 

Pros
  • Easy to use
  • Lightweight
  • Multiple lengths
  • Comfort padded handle
Cons
  • It is laborious to carry around when wet.
3

Kaka-mall-Traction-Training-Neoprene

– Most Practical
img
Check On Amazon
Key Features

 This dog leash has a coiling system and a D-ring design that allows ‌you to hang storage or garbage bags when venturing outside with your pet. The padded handle is easy to grasp.

 

THE SCOOP

 This Kaka mall leash is ideal for giving your dog extra freedom on a hike or run. This thick nylon webbing traction rope is durable and sturdy, and its soft padded handle ensures it is comfortable to hold and prevents rope burn. It has a rustproof, heavy-duty metal clip that can withstand a strong pull and a 360-degree rotative metal buckle so your dog can play freely and safely.

Pros
  • Durable nylon
  • Sturdy
  • Padded handle
  • Rustproof clip
Cons
  • This extra long dog leash can tangle easily.
4

Looxmeer-Recall-Lead-Dogs-20m

– Most Superior
img
Check On Amazon
Key Features

The joints of this lightweight lead have reinforced stitching for better strength, and given its width and material composition, this lead will not knot easily. The hand strap has padding, which is for comfortable handling and will not cut or burn the palm of your hand.

 

THE SCOOP

 This high-quality nylon leash and metal carabiner training lead are durable and practical. The long lead design makes it suitable for walking and training your pet. The carabiner hook is metal, so it is robust, tear-resistant, easy to open, and grip. It has a thread at the bottom you can also rotate if necessary. This leash is 360-degree rotatable and prevents the lead from twisting. 

Pros
  • Extra long
  • Suitable for many dog breeds
  • High-quality
  • Tear-resistant
Cons
  • This leash tangles easily
  • The clip on the lead can break
5

Retractable-Extendable-Reflective-Tangle-Free

img
Check On Amazon
Key Features

This leash is 360-degree tangle-free and is convenient for running, jogging, camping, and hiking. It has a highly reflective cord to increase visibility and ensures safety for you and your pet at night.

THE SCOOP

 This nylon retractable 16 feet long leash with a rustproof swivel hook has a durable internal coil spring for consistent retraction and will allow your dog to have the freedom to explore while still being attached to you. It has an ergonomic anti-slip soft handle, combined with wear-resistant, soft rubber coating technology, which is comfortable and non-slip. It also has a quick lock feature that ensures easy roll-on and roll-off with your thumb.

Pros
  • Reflective
  • Quick locking and unlocking
  • Retractable
  • Easy to clean
Cons
  • This leash retracts ‌slowly.

Buying Guide:

Shopping for a dog leash is challenging with the various options available. Consider the factors below when‌ buying your dog leash to ensure‌ you choose the right one for your pet's needs:

  • Type of dog: We suggest long leashes for curious puppies or dogs who enjoy following their nose on walks. A long leash gives them enough room to play and run. In addition, long leashes give you the chance to practice your commands.
  • Strength: The fuller your dog, the heavier the leash needs to be. Leash material, clip size, and thickness play a part in your leash weight. A heavy leash will be uncomfortable for a Chihuahua, while a German shepherd should have no problem with the added weight. In addition, consider your strength as well. If the leash is too long, your dog will ‌throw you off your feet if they bolt. 
  • Style and material: Consider your comfort just as much as your dog. Leash material can either be comfortable or downright painful to hold, depending on which one you choose. Nylon leashes are durable, but if your dog is a puller, the nylon will burn your hand every time your dog pulls. Leather leashes are more comfortable in your hand. They require more maintenance, particularly in rainy or damp weather.
  • Leash loop and clip: Consider the leash loop size. If the opening is too loose or too small, you will not have a proper, secure grip, and your dog could run away. Also, consider the leash clip, which comes in various styles. If you have problems with dexterity, we recommend choosing a clip that unhooks.
  • Cost: The prices of leashes vary. Consider which best suits your needs and your pockets. 

FAQ

Q: What is a long leash?

A: A standard dog leash is six feet long, so a long leash is any leash that exceeds that length. But the term long leash or long lead usually refers to leashes that are ten feet or longer. The upper limit for long leashes is ‌100 feet, as it is difficult to manage anything longer.  Long leads mimic the sensation of off-leash fun for dogs while providing some extra safety. They are like standard leashes in that they feature a handle or loop for you to hang on to and a clasp to clip to the collar or leash. There is one other significant difference: Long leashes are ultralight.  

Q: What is the purpose of long dog leashes?

A: Long leads can allow your dog to go on more extensive sniffing expeditions. Sniffing around is not just fun but enriching for your dog. They are also great for training in public areas. Long leashes give you security while training in large open spaces, and they are ‌helpful for commands like to stay. One skill to build with your dog is teaching your dog to come when called, known in training lingo as recall. Long leashes are great for recall work, as you can let your dog wander and sniff until the end of the line and then call your dog back to your side.  Long leashes are also great for puppy and reactive training and off-leash training. Long leashes allow you to practice off-leash manners before fully committing to the real thing. If a dog does not reliably listen to you on a long leash, it is not ready for off-leash walks.

author-image
By Editor
  • Home
  • About
logo
Copyright Paws, Claws and Tails © 2023
  • Privacy Policy